What happens during a one-week cabinet transformation?
Day 1 — Removal & prep
We take off every door and drawer, label the hinges and hardware, and prep the boxes in place.
Days 2–4 — Shop spray
Doors are primed and sprayed in our ventilated shop with dry-times between coats. Temperature and humidity controlled — this is why the finish has zero brush marks.
Day 5 — On-site boxes
We build plastic containment around the kitchen and spray the boxes. Your kitchen is out of service for this one day.
Days 6–7 — Reinstall
New hinges, pulls, and soft-close if ordered. Doors go back on, we align every face, and hand you a fresh kitchen.