
Porch Floor, Steps & Railings in Norwood, MA
A Norwood home's front and back porches: floor boards and steps painted gray, with railings, balusters and lattice skirting in white.
See the photos →Siding, trim, porches and doors on Malden single-families and multi-unit buildings, prepared for the age of the paint already on them.
Of the 27,876 housing units the census counts in this city, 12,572 were built in 1939 or earlier. On an exterior, that age shows up as layer on layer of past paint jobs, some of them oil, some latex, and the oldest very possibly lead. Paint fails where those layers lose their grip on each other or on the wood: peeling on the sunny side, blistering where moisture comes through from inside, and cracked, alligatored finishes on trim.
Good exterior work here is mostly decided by how much of that old film comes off and how it is removed.
Census data show 70.9% of units were built before 1980. For any pre-1978 house, the EPA's Renovation, Repair and Painting rule requires certified contractors to contain paint chips and dust when they disturb exterior paint. In practice that means ground sheeting under every wall being scraped, no open-flame burning or uncontrolled power sanding, and daily cleanup. On lots where houses sit close together, containment also protects the yard and driveway next door.
The details are on our lead-safe painting page. The city's Lead and Healthy Homes Program lists exterior repainting among the lead-hazard work it can fund for pre-1978 homes in households below 80% of Area Median Income, as a three-year forgivable loan.
The city has no local historic district yet. A study committee is looking at Downtown and Corey Road, and its Corey Road report describes that area as what would be the first. The draft ordinance for Corey Road lists paint color among the things the commission would not review, but it is a proposal, not law.
What does exist is a Demolition and Alteration Delay Ordinance run by the Malden Historical Commission. Its application covers partial alterations, not only demolition. We could not confirm from the ordinance which exterior changes trigger a filing, so if your project replaces siding, trim or windows on an older building, ask the commission whether a Notice of Intent is needed before work begins.
A third of the housing (33.6%) is in two- to four-unit buildings. Painting one of these involves more than the walls: shared porches and stairs, separate entry doors, and owners or tenants who each need notice about ladders under their windows. If the building is a condominium, the association, not one owner, usually decides on exterior color and timing; the condo painting page covers that process.
On any house that borders the Middlesex Fells or another wooded lot, expect the shaded walls to hold moisture longer and grow mildew. Those walls need washing and a mildewcide-treated primer before topcoats.
Exterior latex paints list minimum application temperatures on the label, often 35 to 50°F, and the surface must stay dry while the film sets. As fall goes on, colder mornings and dew that is slow to dry off shaded walls shorten the working day. Trim, doors or a single elevation may still fit into a run of mild, dry days, while a whole-house repaint started now risks running out of usable weather. Read whether November painting works in Massachusetts for the details.
Owners in Maplewood, Edgeworth, Bell Rock and the West End can book a walkaround now to get a written scope before spring.
| Units built in 1939 or earlier | 12,572 of 27,876 (45.1%) (U.S. Census ACS 2020–2024 5-year, table B25034) |
| Units built before 1980 | 70.9% (U.S. Census ACS 2020–2024 5-year, table B25034) |
| Local historic districts | None adopted; Downtown and Corey Road under study (City of Malden, Local Historic District Study Committee) |
| Demolition & Alteration Delay Ordinance | Title 4.24, administered by the Historical Commission (City of Malden, Historical Commission) |
| Units in 2–4 unit buildings | 33.6% (U.S. Census ACS 2020–2024 5-year, table B25024) |
These jobs were in other towns, not in Malden. Each card names the town where the work was done.

A Norwood home's front and back porches: floor boards and steps painted gray, with railings, balusters and lattice skirting in white.
See the photos →
A garage building in Weymouth with white overhead doors and masonry pilasters whose paint was peeling. The doors and service doors were painted red and the pilasters refinished in gray.
See the photos →There is no adopted local historic district, so no district commission reviews paint colors. The city does have a delay ordinance covering demolition and alteration; if your project goes beyond paint, such as replacing siding or windows, check with the Historical Commission first.
The proposed Corey Road district covers ten specific houses, and its draft ordinance excludes paint color from review. It has not been adopted, so nothing applies yet.
Not necessarily. Loose paint must be removed and edges feathered, but well-bonded old paint can stay under a good primer. Full stripping is slower, costlier and, on pre-1978 paint, creates more lead dust to control.
Possibly. The Lead and Healthy Homes Program funds lead-hazard work, including exterior repainting, for pre-1978 homes in households under 80% of Area Median Income. Contact the city's planning office to see if you qualify before you sign a contract.
It depends on the job and the forecast. A full repaint needs many consecutive days above the label minimum with dry surfaces, which get scarce from here on; smaller pieces can sometimes be done on warm, dry days.
We don't post AJ prices. The exterior painting cost guide gathers Massachusetts market data; on older buildings, the amount of scraping, lead-safe containment, carpentry and ladder or staging access tend to matter more than the paint itself.
Free on-site visit and written estimate from a licensed, insured painter. Call AJ Painting at (508) 258-4325, Monday to Saturday, 7AM to 6PM.
5.0 on Google · 35 verified reviews · Licensed & insured · Written quote in 48h